Gold Coast airport recloser upgrade
07 August, 2007 | Supplied by: NOJA Power Switchgear Pty Ltd
Gold Coast Airport upgraded its electricity supply to cater for its increasing energy consumption from growing passenger movements. Being an 'always-on-line' site, special design and installation skills were needed to make it happen smoothly
Keeping up with RCD developments
05 August, 2007 by Paul Stathis
The new Wiring Rules are likely to regulate the use of RCDs more stringently than before, so contractors will need to understand what's now required of them
Electricity supply quality for large-scale arts complex
23 July, 2007 | Supplied by: Cummins Australia
Temperature and humidity control are vital for preserving sensitive art and historical collections and these environmental control systems depend on reliable electric power to ensure they're always functioning
Environmental criteria for enclosures
20 July, 2007
Electrical equipment can be harmed by environmental factors including water, airborne particles and thermal extremes. The right enclosures minimise the negative impact of the environment and contribute to their longevity
Business-critical electrical supply continuity solution for NZ ISP
18 July, 2007 | Supplied by: Vertiv Australia Pty Ltd
ICONZ, one of New Zealand's first internet service providers, is implementing power protection and cooling solutions from Emerson Network Power to ensure business-critical continuity at its newly built data centre in Auckland
Long spade drill bit
15 July, 2007 | Supplied by: Long Drills Pty Ltd
The Morris long spade drill bits are available in lengths of 1100, 1600 and 2100 mm suitable for boring 16, 20 or 25 mm diameter holes into wood.