After architectural firm Williams Burton Leopardi bought the dilapidated Darling Building in Adelaide, they learned that the planned peak energy demand for the renovated building would be more than what the local power grid could supply.

The building, built in 1916 for wheat exporter John Darling and Son, had been largely neglected since the 1960s.

The peak power draw for the building during summer was calculated at 290 amps, whereas SA Power Networks could initially supply only 150 amps (although this was later revised upwards to 200 amps). Williams Burton Leopardi Director David Burton said most of the solutions were so expensive they would have made the renovated building commercially unviable. “We didn’t have the space in the building for a transformer; gas would cost us hundreds of thousands of dollars and ‘winging it’ was not an option,” he said.

“During a conversation with Simon Hackett, who was a client with his Base64 redevelopment, he said ‘you need a battery as a peak management system’. When we looked at it, it stacked up, so we went with a scalable energy storage system based on Redflow batteries. We have six ZBM2s now, but we can scale the system to 12 or even 18 batteries if we require them.

“The main purpose of the system is to ensure that the batteries can supply energy if the building’s demand outstrips the grid’s supply capacity, so it is primarily a peak management methodology. But they are also configured to buy power at low demand times to recharge the batteries, and when power spikes past a certain price, they dribble energy into the load to manage that spike down.”

The award-winning five-storey renovated Darling Building on Franklin Street now has new lighting, air-conditioning systems, kitchen facilities, and washing machines and dryers on each floor, as well as a fully rebuilt heritage-listed elevator. Redflow partner Solar Depot installed the ZBM2 batteries with three Selectronic SP Pro inverters, delivering three-phase power from the building’s basement.

The only notable challenge was gaining fire compliance approval from the Metropolitan Fire Service, which acknowledged that zinc-bromine flow batteries comply with all the relevant building codes concerning fire rating as they do not present the same fire risk as lithium-ion batteries.

Burton said Redflow batteries were uniquely suited for the building’s needs. “For what we want to do, zinc-bromine batteries are ideal,” he said. “ZBM2s can deep cycle without damaging the battery and they embody the concept of simplicity and look quite nice in their rows.

“Lithium-ion batteries would’ve cost us a lot more to completely fire-rate the room because lithium is like putting a bomb in your basement. With the Redflow batteries, we just open the windows and a fan circulates the air.

“One battery system could support several buildings,” said Burton. “With solar on the roof, you’d get a lot of power in, so it could operate as a mini storage facility and power station — if the statutory regs allow that kind of thing to start happening.”

Redflow CEO Tim Harris said the Darling Building deployment demonstrated the unique benefits provided by zinc-bromine flow batteries. “As well as their inherently non-flammable characteristics, Redflow batteries can store and discharge energy every day for years without any loss of storage capacity,” he said.

Image supplied by Redflow.

Online: www.redflow.com
Phone: 07 3376 0008
Related Products

Power Integrations InnoMux-2 switcher ICs

Applications include TVs, monitors, appliances, networking, home and building automation, LED...

Itron low-voltage distributed energy resource management system

The solution delivers a data-driven method for managing consumer energy resources, such as...

Toshiba TK042N65Z5 and TK095N65Z5 power MOSFETs

Applications include switching power supplies, EV charging stations, power conditioners for...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd