Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Field Service Efficiency: Strategies for Improvement
Efficiency in field service delivery is vital for field service organisations to achieve...
How APAC leaders are transforming field operations
Learn how the leaders in your industry are leveraging mobility and innovative technologies...
Assembled vs overmoulded cordsets – which industrial connectivity solution is best?
Connectivity serves as a cornerstone for industrial automation environments delivering...

