Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

Reviewing Field Service Strategy: Aligning Focus and Execution

Safeguard your fleet from the probable penalties

Breaking the law when driving a loaded work ute or trailer is not difficult. The difficulty is...

Virtualised data centres and 40/100 GbE

Virtual environments offer businesses some very tangible ROI, but getting the infrastructure...


  • All content Copyright © 2026 Westwick-Farrow Pty Ltd