Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

Assembled vs overmoulded cordsets – which industrial connectivity solution is best?

 Connectivity serves as a cornerstone for industrial automation environments delivering...

The future of field operations: energy and utilities sector

Find out how mobile technology can help you reduce...

Case Study: How Australian Based Tenix Is Addressing Today’s Field Service Challenges

The Service Council’s latest research on field service challenges highlights how...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd