Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Service Transformation: The Business Case
For service transformation to be successful, there needs to be a transformation in the way...
How to avoid DC resistance unbalance in your PoE systems
Resistance unbalance in structured cabling links has now become a critical parameter to...
The top strategies delivering customer value in 2016
Customer satisfaction is a moving target. To secure those crucial business referrals your...

