Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

Your cable management guide for a scalable and efficient infrastructure

In this guide, we explore the key challenges of...

How to maximise the ROI of your mobile device

Mobile options for your business are endless, yet few can actually meet all of your needs....

Genuinely rugged or pretender — how do your field service devices rate?

Eight out of ten field service devices will be exposed to stressors including drops and...


  • All content Copyright © 2026 Westwick-Farrow Pty Ltd