Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
[White paper] Your guide to industrial limit switch technology
Straight-forward and cost-effective switching...
Paperless automation a proven success
Going paperless isn’t so much about eliminating paper — it’s about streamlining operations by...
The essential guide to prefabricated DC deployment
The deployment process of a prefabricated data centre differs greatly from a traditional data...

