Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
The 5 best ways to cut fuel costs
Given that fuel is the largest fleet operating cost, managing fuel consumption is essential...
Optimise your field service performance with systemisation
Customer complaints constantly stem from businesses providing incorrect information: site...
Maximise your distribution growth with digitisation — an eBook
Digitalisation is essential to the longevity of your business and crucial to improve your growth.
