Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Optical fibre - unparalleled bandwidth capacity
The requirements for speed and reliability of internet access have never been...
DC energy performance management — a best practice guide
Rising energy prices, along with green lease and smart electricity systems, are set to...
Electrical services in building fires
With increasing attention to risk management and environmental sustainability, there has been...

