Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Meter technology and the residential market boom — an eBook
The Australian electrical services industry has weathered a constant state of change in...
Case Study: How Australian Based Tenix Is Addressing Today’s Field Service Challenges
The Service Council’s latest research on field service challenges highlights how...
Automated scheduling and dispatch - how to increase revenue and customer satisfaction
One of the problems the field service industry faces is how to better optimise resources to...

