Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
IoT, connectivity and the new look electrical industry — an eBook
Smart cities and smart grids facilitate two-way energy and information flow...
New-generation signage displays with LCD panel resizing technology
Being so ubiquitous, it is clear to see that digital signage has today developed into a popular,...
Advanced analytics for Australian service management operations
How can you leverage digital transformation to provide higher levels of service, enhance...