Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

General instructions on lightning safety for shelters

Severe lightning injuries and fatalities are reported each year from all over the world,...

Fire risks and best practices to safeguard your EV parking

Discover how to reduce your risk and how to best...

How too much information can drown your business

A critical problem facing field service businesses running paper-based systems is data...


  • All content Copyright © 2026 Westwick-Farrow Pty Ltd