Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Benefits of enterprise-grade mobile devices
Many field service companies, large manufacturers, logistic companies, healthcare providers...
Digital transformation can reduce field service response times by 80–90%
Forward-thinking businesses are adopting IoT strategies to reduce service response times by...
7 steps to ensure effective cable management
A comprehensive strategy is critical when managing power and data cables within IT racks....