Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Assembled vs overmoulded cordsets – which industrial connectivity solution is best?
Connectivity serves as a cornerstone for industrial automation environments delivering...
The future of field operations: energy and utilities sector
Find out how mobile technology can help you reduce...
Case Study: How Australian Based Tenix Is Addressing Today’s Field Service Challenges
The Service Council’s latest research on field service challenges highlights how...