Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Safeguard your fleet from the probable penalties
Breaking the law when driving a loaded work ute or trailer is not difficult. The difficulty is...
How small cell systems deliver on big wireless traffic demands
With wireless network traffic growth booming, carriers are increasingly dependent on small...
What field technology will deliver the best ROI in 2020?
Zebra’s 2015 field operations vision study found that 70% of field personnel expect budget...

