Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

Deliver five-star field service engagement — an eBook

Field service engagement is the connective tissue between service technology and customers....

How small cell systems deliver on big wireless traffic demands

With wireless network traffic growth booming, carriers are increasingly dependent on small...

Manage lunch breaks to maintain peak efficiency

The field worker lunch break is not only shrinking, in some cases it has disappeared...


  • All content Copyright © 2026 Westwick-Farrow Pty Ltd