Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
Skill shortages and automation fears in field services and trade
Discover some surprising statistics on automation in your industry and learn how to successfully...
How to avoid everyday IT support roadblocks — an infographic
A company of 10 employees can lose as much as $183/hour of downtime plus the cost of...
Enhancing Cable Management with WBT's Optical Fibre Ducting Raceway (OFDR) Solutions
Effective cable management is essential for...

