Rio Tinto decarbonises with solar energy storage — a case study
Supplied by Valen on Thursday, 31 August, 2023
Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.
Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.
How to revolutionise your machine control with scalable intelligence
[Guide] Smarter Electrical Control for Next-Level...
Designing a metering system for small and medium-sized buildings
With rising energy costs, environmental pressures and unreliable power supply, there is a need...
New-generation signage displays with LCD panel resizing technology
Being so ubiquitous, it is clear to see that digital signage has today developed into a popular,...