Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

How to motivate your field workforce by using mobile apps

Mobile apps are the easiest way to get field engineers connected and in sync with everything...

5 critical field service metrics to know

Field service leaders have an abundance of statistics to possibly track. Which metrics would...

[White paper] Your guide to industrial limit switch technology

Straight-forward and cost-effective switching...


  • All content Copyright © 2026 Westwick-Farrow Pty Ltd