The essential guide to prefabricated DC deployment
Supplied by Schneider Electric IT Business on Thursday, 05 November, 2015
The deployment process of a prefabricated data centre differs greatly from a traditional data centre. From designing the data centre, to preparing the site, to procuring the equipment, to installation, you can expect a change in the nature of planning and a dramatically compressed schedule.
The deployment process of a prefabricated data centre differs greatly from a traditional data centre. From designing the data centre, to preparing the site, to procuring the equipment, to installation, you can expect a change in the nature of planning and a dramatically compressed schedule.
Download this white paper for guidance through the prefabricated data centre deployment and discover what to expect.
How to upgrade your industrial operations for maximum profitability
Examine six essential criteria that you need to...
Top tips to avoid power quality disturbances
This paper reviews the most common types of power disturbances, what causes them and how to...
New-generation signage displays with LCD panel resizing technology
Being so ubiquitous, it is clear to see that digital signage has today developed into a popular,...