Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

Mobile apps provide operational efficiency and productivity

Today’s field technicians require accurate and up-to-date information in order to deliver...

Safeguarding your business in the digital age

Data security is one of the key risk factors facing field organisations today. What are the...

PPC-615A/6170A - a simple solution for machine vision

This white paper illustrates how design can conquer various problems faced in manufacturing...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd