Rio Tinto decarbonises with solar energy storage — a case study

Supplied by Valen on Thursday, 31 August, 2023


Rio Tinto had site access gates that required power to operate. At the time, the only option was to dig long trenches to run power lines, which brought cost and complexity. Due to the remoteness of the site location, the solution also needed to include remote monitoring to alert to smoke, intruders, theft and tampering, as well as provide shade and weather protection.

Learn about how Rio Tinto leveraged a modular, maintenance-free, easy-to-install, standalone solar system to solve their problem. Discover how to utilise free solar power to reap the benefits of no ongoing electricity bills.


Related White Papers

Save up to 15% of your company’s annual fuel cost

Fuel is the largest fleet operating expense, so efficient fuel utilisation is essential for...

Fleet management and the gamification revolution

The use of game mechanics in business applications is a growing trend. Research has revealed...

How to leverage variable cooling for advanced DC infrastructure

Examine expert guidance on thermal management in relation to variable load profiles in...


  • All content Copyright © 2024 Westwick-Farrow Pty Ltd